Hmm.. Been looking through friends blog, thinking the same thing as Lip Siong said on his. I come to train on site, well of course there are things that you can learn on site alone only, but on the same way, I also missed up the chance to mess with design and stuffs. Well cant help it right, do my job right and hope it will get better and better. Anyway, I also dislike being confined in a four wall closets for 10 hours a day. Engineer, don't look too high up on them, sometime even a experienced workers or supervisor knows more than them. Well it also depends, advice is, learn and change and solve, being a living body with dead mind cant get you anyway further.

Alright, cut the talking. Still the same old routine, as pointed out in the previous post. Check here and there, mess here and there. Anything new? Yea, Mr Chiew arrived, our new Construction Manager. Brief him about the current condition of the Balai. 

Worklist? Check archi, concreting works, leveling, helping my supervisor with some task, checking and counting needed quantities off drawing, get consultation from RE and CoW, discussion with Sub Con about the work, Materials, trusses. Oh! Get a new task from my superior though. From now, the volleyball game court will be under my supervision. Nothing much for now, just bakau piling. 1000++ points. hahaha. O_O

Receive the revised drawing of structural drawings of balai center area, the most complicated area within balai. What i saw is only headache, follow by more headache. 

Oh the rectification works also starts, for the previous detached beam. Now to permanently fixed it. Let's go through along with the photos shall we?

 Done RC gutter
 Truss team above lokap
Huge
 More!
 Checking on the rebar
 Hmmmmm
 Concreting preparation
 RC piling for the DI pipeline beside balai at the same time
 Drive Drive Drive
 Welding
 Concreting
 Mr Ting in action
 Our Meeting Room
 Nice. Site Layout, but the drawing still smaller then the one in our contractor office. 16 A4 papers, many info, credits to my superior, Aki, or Mr Nicholas Jee
Preparation
Still have time, lets do marking for the game court.
Nice blue sky
Kato is carrying the gutter to lessen the weight
 Double chain block to pull the structure back to shape once the weight is lessen
It's back!!!
More work coming along
Putting 2 Steel I beam at designated places
Fine tune it with hydraulic jack
Good job Kato
Now what left is concrete the I beam and hack the detached parts to retie the rebar, and regrout it.
Intel inside? No. It's I beam inside.
Mmmmm
Look From Below
Long time haven't visit lokap huh. The hole left is for hacking, due to the change of the drawings. Original brickwall had to be hack. \(++)/
External brickwall, the hole is for the RC fin and ledge, another architectural trick -__-
Lintels up. Time to finish it.

That's all for this week. Till then, Ciaoz